![]() Plenum assembly is then installed from the rear of the 19-inch rack, or fromĬomponents are assembled after the plenum is mounted in the rack, the plenumīase is first installed from the front (applicable to 19-inch rack). The air plenum kit are pre-assembled before mounting in the rack, the sideīaffles and air deflector are attached to the plenum base outside the rack. Pre-assembled before mounting in the rack or assembled after the plenum base is The steps for mounting the air plenum kit in the rack areĭifferent, depending on the whether the components of the air plenum kit are Mounted in the rack before the Cisco ASR 9000v satellite shelf or ASR901 router In the event of fan failure, the system can operate at 60 degrees Celsius (140 degrees Fahrenheit) for four hours maximum. When the air plenum kit is installed with the Cisco ASR 901 router, the maximum system operating temperature is 65 degrees Celsius (149 degrees Fahrenheit). When the air plenum kit is installed with the Cisco ASR 9000v satellite shelf, the maximum system operating temperature is 55 degrees Celsius (131 degrees Fahrenheit).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |